Men’s Pullover with Polo-Neck
You’ll need:
700g of Gedifra Fashion Trend yarn (51% wool, 49% polyacryl; 90m/50g) in mélange green color;
Knitting needles 5,5;
Circular knitting needles 5 and 5,5 (40 cm long);
Crochet hook 5.
Size: S-L.
Used Patterns
Pattern with cable and rhomb: due to the scheme A. Numbers from the right side mean RS rows. Make WS rows due to the ornament. Make 35 sts in width between arrows once. For cable, repeat 1st-8th rows from the right side on 11 sts, for rhomb, repeat 1st-28th rows from the left side on 24 sts.
Cabled pattern: work due to the scheme B. Numbers from the right side mean RS rows. Make WS rows due to the ornament. Repeat the pattern of 16 sts in width between arrows a and b and finish with 8 sts after the 2nd arrow. Repeat 1st-8th rows in height.
Stitches control: pattern with cable and rhomb: 20 sts x 21,5 rows = 10 x 10 cm.
Instructions
Front and Sleeves
Knit across. For pattern with cable and rhomb, make 1st-28th rows x 12 times, then, make 1st-2nd rows x once = totally, 333 rows. Start with left half of sleeve. Cast on 32 sts with knitting needles 5,5 and work with the pattern with cable and rhomb: 1 selvage st, 1st-30th sts due to the scheme A, 1 selvage st. Increase 1 st in the 7th row from the initial row from the left side for sleeve chamfer, then, 8 x 1 st in every 8th row, 2 x 1 st in every 6th row, 5 x 1 st in every 4th row, 4 x 1 st in every 4th row = 52 sts. Include the first 5 increased sts in the pattern with cable and rhomb, the rest 15 sts – in cabled pattern in the 1st-15th sts after arrow a. In 52 cm = 112 rows from the set-up row, cast on 89 sts from the left side for front = 141 sts. Include these sts in the cabled pattern, start with the 16th st – purl before arrow b, repeat the pattern x 5 times, finish with 8 sts after arrow b and 1 selvage st. Knit straight for 13 cm = 38 rows, then, bind off 3 sts for the neck-hole from the right side, 2 x 3 sts and 1 x 2 sts in every 2nd row = 130 sts. In 9 cm = 19 rows from the beginning of neck-hole, details are made to the front center line. Make the second half of front with right half of sleeve in symmetry to the previously described half. Then, bind off the sts.
Back with Sleeves
Make in symmetry to front.
Assembly
Make all the seams. Cast on 64 sts with circular knitting needles along the neck-hole line. Make polo-neck collar. At 4 cm height, turn to circular knitting needles 5,5. At 22 cm height, bind off the sts loosely due to the ornament. Fasten the lower edges of sleeves and pullover with 1 row of “shrimp stitch”.