CrochetKnittingMenScarvesHatsGlovesSweatersCardigansSocksOther clothingWomenScarvesHatsGlovesShawls and cover upSweatersCardigansSocksSlippersBagsOther clothingChildrenScarvesHatsGlovesSweatersCardigansSocksSlippersBagsOther clothingHomeBlankets and plaidsRugsHome decorationsPetsSchemesOther hand-madeChat
Simple Coffee Mug Knit Sweater
Knitting Needle Size 6 or 4 mm, Double-Pointed Knitting Needles (DPNs)
Yarn Weight(4) Medium Weight/Worsted Weight and Aran (16-20 stitches to 4 inches)
Gauge: 21 sts and 27 rows = 4" [10 cm] in stocking st.
Finished Size To fit mug measurement: Approx 10¼" [26 cm] around x 4" [10 cm] tall
Materials List
Size 4 mm (U.S. G/6) crochet hook for ties
Size 4 mm (U.S. 6) knitting needles. Set of four size 4 mm (U.S. 6) doublepointed knitting needles or size needed to obtain gauge
Lily Sugar’n Cream® (70.9 g/2.5 oz; 109 m/120 yds)
Main Color (MC) Jute (00082) 1 ball or 35 m/40 yds
Contrast A Soft Ecru (01004) 1 ball or 16 m/18 yds
Contrast B Country Red (01530) 1 ball or 5 m/6 yds
Note: 1 ball of MC, A and B will make 3 Cozies
4 small buttons
Instructions
Left Front and Back: With A and pair of needles, cast on 35 sts.
**1st row: (WS). Knit.
2nd row: With MC, knit.
3rd row: P1. *K1. P1. Rep from * to end of row.
Rep last 2 rows for pat once more.
With A, rep last 2 rows once more. Break A.
With MC, cont in pat until work from beg measures 3¾" [9.5 cm], ending with a WS row.
Next row: (RS). With A, knit.
Cast off knitwise (WS).**
Button band: With RS facing and A, pick up and knit 18 sts down edge of Left Front.
Knit 2 rows.
Cast off knitwise (WS).
Right Front: With A and pair of needles, cast on 11 sts.
Work from ** to ** as given for Left Front and Back.
Buttonhole band: With RS facing and A, pick up and knit 18 sts up front side of Right Front.
1st row: (WS). K1. (K2tog. yo. K2) 4 times. K1.
2nd row: Knit.
Cast off knitwise (WS).
Sew buttons to correspond to buttonholes.
Arms (make 2).
With MC and double-pointed needles, cast on 10 sts. Divide sts onto 3 needles (4, 4, 2). Join in rnd, placing marker on first st.
1st rnd: Knit.
2nd rnd: (K1. P1) 5 times.
Rep last 2 rnds until work from beg measures 2" [5 cm]. Break MC.
Mittens: 1st rnd: With A, knit.
2nd rnd: Purl. Break A.
3rd rnd: With B, K4. (Inc1 in next st) twice. K4. 12 sts.
Knit 2 rnds even.
Next rnd: K6. Turn. Cast on 3 sts (thumb). Cast off 3 sts. Pass last cast off st onto left-hand needle. Turn. Knit to end of rnd.
Knit 3 rnds even.
Next rnd: (K2tog) 6 times. Break yarn, leaving a long end. Draw end through rem sts. Pull tightly. Fasten securely.
Ties (make 6).
With A and crochet hook, ch 12. Fasten off.
Sew 1 Tie to each corner of Back. Sew 1 Tie spaced evenly between last 2 ties. Sew rem 3 Ties in same positions across side edge of Right Front.
Finishing
Wrap Cozy around mug and knot Ties in position around mug handle as shown in picture.
Sew Arms to sides of Body. Sew Mittens to front of Body as shown in picture.
Abbreviations
Inc1 Increase 1 stitch by knitting into front and back of next stitch
K2tog Knit next 2 stitches together
Ssk Slip next 2 stitches knitwise one at a time. Pass them back onto left-hand needle, then knit through back loops together.
WS Wrong side
Yo Yarn over
Cont Continue(ity)
Ch Chain(s)
Rem Remaining
Rep Repeat
Beg Beginning
5 comments
Write a comment
Eva
Jan 28, 2020 08:08 AM
My niece will love it, so I'll make it for her
Reply
Susan
Jan 29, 2020 09:36 AM
Yes, she'll love it for sure
Reply
Annabelle
Jan 28, 2020 08:47 AM
Great!
Reply
Evie
Jan 28, 2020 08:59 AM
It looks so cute
Reply
Mia
Jan 28, 2020 09:39 AM
Oh, I love it
Reply