Start new topic Forum Latest digest Sign in Create account
Search
CrochetKnittingMenScarvesHatsGlovesSweatersCardigansSocksOther clothingWomenScarvesHatsGlovesShawls and cover upSweatersCardigansSocksSlippersBagsOther clothingChildrenScarvesHatsGlovesSweatersCardigansSocksSlippersBagsOther clothingHomeBlankets and plaidsRugsHome decorationsPetsSchemesOther hand-madeChat

​Knit Relief Rhombs Wrap

Susan
Susan
Jul 14, 2020 09:36 PM
​Knit Relief Rhombs Wrap
​Knit Relief Rhombs Wrap

You’ll need:

150 (150) 200g of white 100% cotton yarn;

2 bobbins of Glitter threads of golden color;

Circle knitting needles 3,5 (80 cm long);

5 buttons.

Size: S/M(L/XL)XXL.

Length: 44 cm

Bottom width: 130(152)174 cm.

Used Patterns

Garter stitch: all knit sts;

Relief pattern: due to the schemes M1 and M2;

Button-holes are made on the right front – knit 3rd and 4th sts from the middle together, 1 yarn over above the obtained st. Interval between button-holes – 5 cm.

Stitches control: main pattern: 22 sts x 36 rows = 10 x 10 cm.

Instructions

This wrap is made with straight and reversed rows with circle knitting needles.

Cast on 333 (389) 445 sts with 2 threads of yarn – main yarn and Glitter. Make 1 row of knit sts on the wrong side. In the next row: 5 sts of garter stitch (placket), * 6 knit sts, slip 1 st as knit st, knit2tog, draw it through the slipped st, 5 knit sts*; repeat from * to * to last 5 sts, 5 sts of garter stitch. You should get 287(335) 383 sts. Make 1 row of purls on the wrong-side. In the next row: 5 sts of garter stitch, 12 sts due to the scheme M1 A, 252 (300) 348 sts due to the scheme M1 B, 13 sts due to the scheme M1 C, 5 sts of garter stitch. Make 1 pattern repeat M1 in height plus 1 pattern repeat to the row, marked with arrow on the scheme. You should get 35 cm height. Continue making decreases due to the scheme M2: 5 sts of garter stitch, scheme M2, until there are 6 sts left. Include the first st in the pattern of the first 10 rows, then – stockinette stitch, finish with 5 sts of garter stitch. Continue work due to the scheme M2. As a result, there are 126 (146) 166 sts at 43 cm length. Make 6 rowsofgarterstitchonallthests.

Bind off the sts. Sew the buttons.

Like!2
1047
No comments